New Skill Assessment
The IE stop-watch sheet, on screen. Five cycle readings per operation; every derived figure is computed live.
1 · Select the worker
2 · Assessment header
3 · Capacity check — five cycle readings per operation
Enter the stop-watch times in seconds. Achieved/hr, efficiency and grade compute as you type.
Add the operations this worker is being tested on.
Target/hr = 60 ÷ SMV · Achieved/hr = 3600 ÷ average cycle time · Efficiency = achieved ÷ target. Blank rows are ignored on save.
Live result
Recomputed on every keystroke
Overall skill—
Critical×1.5—
Semi-critical×1.2—
Basic×1.0—
Skill-entitled salary—
Current pay—
Gap—
Entitled rate = basic base + (skill − 55) × BDT 20, indexed 3% per year of service.
Select a worker to enable saving.
How this maps to Jibika
In production these rows arrive from Jibika's assessment module rather than being keyed here — the API accepts the same JSON shape. This screen exists so IE can record a capacity check immediately on the floor, and so the calculation is auditable end to end.