Sajeda Islam

501057 · Team Leader · Sewing Line-C04 · joined 17 Sept 2019

← All workers
Current skill
74.9%
Grade B+ · 14 assessments
Since joining
+10.0 pts
Started at 65.0%
Current salary
28,544
+82.2% since joining
Skill-entitled
19,190
Paid BDT 9,354 above skill rate
Skill profile
1 + 6
Meets the 1 + 2 standard · 4 at 80%+
Service
6.9y
83 months · prior experience 2.3y

Pay justification

Partially Justified2026
Skill growth (YoY)-0.8%
Salary growth (YoY)+5.8%
Alignment index-6.6 pts
Justification ratio71%
Recommendation
Set a skill target for next cycle

Improving, but slower than the automatic increment. Agree a specific efficiency target before the next assessment.

Skill and salary since joining — both indexed to 100

If the orange line falls below the blue one, pay has grown faster than measured capability.

Operation profile

Best recorded efficiency per operation

Skill inventory

Every operation this worker has been tested on — the basis for line allocation

OperationCategoryM/CBest eff.GradeTestsLast
Back Pocket Attach With ReinforceCriticalSNLS86.3A+1417 Mar 2026
Attach Welt to body (APW)CriticalAPW82.6A1217 Mar 2026
Bartack body with loopCriticalBartak82.2A617 Mar 2026
Back Pocket AttachCritical2NLS81.9A1117 Mar 2026
Welt Facing AttachSemi-criticalSNLS77.9B+1017 Mar 2026
Join Inseam by OLCriticalOL 572.9B+817 Mar 2026
Welt Top Stitch (Upper & Lower)Semi-criticalSNLS70.2B+717 Mar 2026

Latest assessment — 17 Mar 2026

Assessment #14 · periodic · assessor Kamrul Hasan (IE)

Critical
78.8%
Semi-critical
70.0%
Basic
OperationCategoryM/CTarget /hrCycle times (sec)Avg cycleAchieved /hrEfficiencyGrade
Back Pocket Attach With ReinforceCriticalSNLS7557.258.957.954.758.357.406383.6%A
Attach Welt to body (APW)CriticalAPW17126.924.726.526.124.725.7914081.4%A
Bartack body with loopCriticalBartak20021.822.324.622.620.522.3516180.5%A
Back Pocket AttachCritical2NLS8057.959.256.154.559.157.356378.5%B+
Join Inseam by OLCriticalOL 510053.449.550.850.852.051.287070.2%B+
Welt Facing AttachSemi-criticalSNLS15035.231.631.532.029.531.9611375.1%B+
Welt Top Stitch (Upper & Lower)Semi-criticalSNLS6098.795.089.493.785.092.373965.0%B-

Target /hr = 60 ÷ SMV. Achieved /hr = 3600 ÷ average cycle time. Efficiency = achieved ÷ target. Identical to the IE department's stop-watch method.

Assessment history

Complete audit trail

#DateTypeSkillGradeOpsEntitled
1417 Mar 2026periodic74.9B+720,096
1317 Sept 2025periodic75.8B+719,880
1217 Mar 2025periodic75.4B+719,631
1117 Sept 2024periodic76.6B+719,420
1017 Mar 2024periodic73.4B+719,105
917 Sept 2023periodic74.5B+718,894
817 Mar 2023periodic72.3B+618,603
717 Sept 2022periodic73.4B+518,391
617 Mar 2022periodic74.5B+418,177
517 Sept 2021periodic75.0B+417,952
417 Mar 2021periodic75.8B+317,730
317 Sept 2020periodic69.8B-217,361
217 Mar 2020periodic66.3B-117,046
117 Sept 2019joining65.0B-116,782

Salary history

Every revision, with the skill level at the time

EffectiveReasonFromToIncreaseSkill then
17 Sept 2025annual increment26,18728,544+9.0%75.8%
17 Sept 2024annual increment23,91526,187+9.5%76.6%
17 Sept 2023annual increment21,84023,915+9.5%74.5%
17 Sept 2022annual increment20,03721,840+9.0%73.4%
17 Sept 2021annual increment18,38320,037+9.0%75.0%
17 Sept 2020promotion15,66418,383+17.4%69.8%
17 Sept 2019joining015,66465.0%

Year-by-year record

The yearly average that drives every verdict

YearAvg skillSkill ΔSalarySalary ΔGapVerdict
202675.2-0.8%28,544+5.8%+8249Partial
202575.8+1.5%28,544+9.3%+8545Partial
202474.6+1.9%26,187+9.5%+6647Partial
202373.2-1.3%23,915+9.2%+4901Not justified
202274.2-0.5%21,840+9.0%+3330Partial
202174.5+10.9%20,037+14.3%+1966Partial
202067.2+3.5%18,383+5.8%+904Partial
201965.015,664-1236New

Training record

Measured effect of each intervention

No training recorded for this worker.

Personal file

From the IE assessment sheet and Jibika master

Father's name
Kamal Uddin
Gender
Female
Home district
Habiganj
Previous factory
Envoy Textiles
Factory
Entrust Fashions Ltd. - Unit C
Department
Sewing
Line
Sewing Line-C04
Supervisor
Tarek Uddin
Designation
Team Leader
Prime process
Back Pocket Attach With Reinforce
Process category
Critical
Status
ACTIVE