Parvez Bhuiyan
501160 · Operator · Sewing Line-C10 · joined 16 Feb 2022
Pay justification
Only 63% on Bottom Hem — below the 70% qualifying line. Either put a trainer on it or move the worker to a process that suits them.
Skill and salary since joining — both indexed to 100
If the orange line falls below the blue one, pay has grown faster than measured capability.
Operation profile
Best recorded efficiency per operation
Skill inventory
Every operation this worker has been tested on — the basis for line allocation
| Operation | Category | M/C | Best eff. | Grade | Tests | Last |
|---|---|---|---|---|---|---|
| Sew second st. at bk pocket | Semi-critical | SNLS | 70.6 | B+ | 16 | 16 Aug 2026 |
| Attach Back/Front patch pocket | Critical | SNLS | 70.1 | B+ | 11 | 16 Aug 2026 |
| Bottom Hem | Critical | 2NCS | 62.6 | B- | 19 | 16 Aug 2026 |
| Top st. Welt pocket bag with fold | Critical | SNLS | 59.8 | C | 13 | 16 Aug 2026 |
| Bartack body with loop | Critical | Bartak | 51.5 | C | 8 | 16 Aug 2026 |
Latest assessment — 16 Aug 2026
Assessment #19 · periodic · assessor Shahidul Alam (IE)
| Operation | Category | M/C | Target /hr | Cycle times (sec) | Avg cycle | Achieved /hr | Efficiency | Grade | ||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Attach Back/Front patch pocket | Critical | SNLS | 100 | 49.8 | 55.5 | 53.0 | 54.5 | 52.6 | 53.07 | 68 | 67.8% | B- |
| Bottom Hem | Critical | 2NCS | 80 | 74.1 | 73.4 | 73.8 | 80.3 | 69.1 | 74.13 | 49 | 60.7% | B- |
| Top st. Welt pocket bag with fold | Critical | SNLS | 60 | 109.7 | 121.8 | 109.9 | 112.7 | 113.7 | 113.56 | 32 | 52.8% | C |
| Bartack body with loop | Critical | Bartak | 200 | 36.5 | 42.8 | 39.4 | 38.6 | 40.5 | 39.56 | 91 | 45.5% | D |
| Sew second st. at bk pocket | Semi-critical | SNLS | 120 | 46.4 | 50.1 | 44.9 | 42.6 | 43.6 | 45.53 | 79 | 65.9% | B- |
Target /hr = 60 ÷ SMV. Achieved /hr = 3600 ÷ average cycle time. Efficiency = achieved ÷ target. Identical to the IE department's stop-watch method.
Assessment history
Complete audit trail
| # | Date | Type | Skill | Grade | Ops | Entitled |
|---|---|---|---|---|---|---|
| 19 | 16 Aug 2026 | periodic | 60.8 | B- | 5 | 17,724 |
| 18 | 16 May 2026 | periodic | 59.3 | C | 5 | 17,573 |
| 17 | 16 Feb 2026 | periodic | 60.6 | B- | 5 | 17,485 |
| 16 | 16 Nov 2025 | periodic | 61.4 | B- | 5 | 17,385 |
| 15 | 16 Aug 2025 | periodic | 63.4 | B- | 5 | 17,312 |
| 14 | 16 May 2025 | periodic | 62.1 | B- | 5 | 17,168 |
| 13 | 16 Feb 2025 | periodic | 61.5 | B- | 5 | 17,036 |
| 12 | 16 Nov 2024 | promotion | 63.6 | B- | 5 | 16,965 |
| 11 | 16 Aug 2024 | periodic | 60.4 | B- | 4 | 16,779 |
| 10 | 16 May 2024 | periodic | 61.3 | B- | 4 | 16,681 |
| 9 | 16 Feb 2024 | periodic | 61.4 | B- | 4 | 16,566 |
| 8 | 16 Nov 2023 | post training | 58.2 | C | 3 | 16,381 |
| 7 | 16 Aug 2023 | periodic | 59.5 | C | 3 | 16,292 |
| 6 | 16 May 2023 | periodic | 57.0 | C | 2 | 16,123 |
| 5 | 16 Feb 2023 | periodic | 59.9 | C | 2 | 16,066 |
| 4 | 16 Nov 2022 | periodic | 56.4 | C | 2 | 15,876 |
| 3 | 16 Aug 2022 | periodic | 54.9 | C | 1 | 15,733 |
| 2 | 16 May 2022 | periodic | 55.9 | C | 1 | 15,635 |
| 1 | 16 Feb 2022 | joining | 52.5 | C | 1 | 15,500 |
Salary history
Every revision, with the skill level at the time
| Effective | Reason | From | To | Increase | Skill then |
|---|---|---|---|---|---|
| 16 Feb 2026 | annual increment | 22,938 | 25,002 | +9.0% | 60.6% |
| 16 Feb 2025 | promotion | 19,408 | 22,938 | +18.2% | 61.5% |
| 16 Feb 2024 | annual increment | 17,644 | 19,408 | +10.0% | 61.4% |
| 16 Feb 2023 | annual increment | 16,187 | 17,644 | +9.0% | 59.9% |
| 16 Feb 2022 | joining | 0 | 16,187 | — | 52.5% |
Year-by-year record
The yearly average that drives every verdict
| Year | Avg skill | Skill Δ | Salary | Salary Δ | Gap | Verdict |
|---|---|---|---|---|---|---|
| 2026 | 60.2 | -3.3% | 25,002 | +9.3% | +7278 | Not justified |
| 2025 | 62.3 | +1.7% | 22,938 | +17.6% | +5514 | Partial |
| 2024 | 61.2 | +4.7% | 19,408 | +9.9% | +2403 | Partial |
| 2023 | 58.5 | +6.8% | 17,644 | +8.3% | +1224 | Partial |
| 2022 | 54.8 | — | 16,187 | — | +272 | New |
Training record
Measured effect of each intervention
| Programme | Date | Hours | Before | After | Gain |
|---|---|---|---|---|---|
| Overlock Efficiency Improvement | 04 Oct 2023 | 25 | 47.3 | 58.2 | +10.9 |
Personal file
From the IE assessment sheet and Jibika master