Md. Shahidul Ali
501212 · Operator · Cutting-C01 · joined 23 Mar 2025
Pay justification
Only 55% on Make flap/cuff with zig pattern — below the 70% qualifying line. Either put a trainer on it or move the worker to a process that suits them.
Skill and salary since joining — both indexed to 100
If the orange line falls below the blue one, pay has grown faster than measured capability.
Operation profile
Best recorded efficiency per operation
At least three assessed operations are needed to draw the profile.
Skill inventory
Every operation this worker has been tested on — the basis for line allocation
| Operation | Category | M/C | Best eff. | Grade | Tests | Last |
|---|---|---|---|---|---|---|
| Make flap/cuff with zig pattern | Semi-critical | SNLS | 55.5 | C | 6 | 23 Jun 2026 |
| Attach D/fly,Join & top st. front left right | Semi-critical | SNLS | 53.4 | C | 3 | 23 Jun 2026 |
Latest assessment — 23 Jun 2026
Assessment #6 · post training · assessor Yeasmin Akter (IE)
| Operation | Category | M/C | Target /hr | Cycle times (sec) | Avg cycle | Achieved /hr | Efficiency | Grade | ||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Make flap/cuff with zig pattern | Semi-critical | SNLS | 80 | 78.6 | 83.2 | 80.9 | 86.5 | 76.7 | 81.16 | 44 | 55.5% | C |
| Attach D/fly,Join & top st. front left right | Semi-critical | SNLS | 171 | 41.1 | 39.6 | 39.6 | 37.4 | 40.9 | 39.70 | 91 | 52.9% | C |
Target /hr = 60 ÷ SMV. Achieved /hr = 3600 ÷ average cycle time. Efficiency = achieved ÷ target. Identical to the IE department's stop-watch method.
Assessment history
Complete audit trail
| # | Date | Type | Skill | Grade | Ops | Entitled |
|---|---|---|---|---|---|---|
| 6 | 23 Jun 2026 | post training | 54.2 | C | 2 | 15,305 |
| 5 | 23 Mar 2026 | periodic | 53.8 | C | 2 | 15,196 |
| 4 | 23 Dec 2025 | periodic | 53.3 | C | 2 | 15,087 |
| 3 | 23 Sept 2025 | post training | 51.7 | C | 1 | 14,979 |
| 2 | 23 Jun 2025 | promotion | 51.6 | C | 1 | 14,870 |
| 1 | 23 Mar 2025 | joining | 54.4 | C | 1 | 14,761 |
Salary history
Every revision, with the skill level at the time
| Effective | Reason | From | To | Increase | Skill then |
|---|---|---|---|---|---|
| 23 Mar 2026 | annual increment | 15,262 | 16,712 | +9.5% | 53.8% |
| 23 Mar 2025 | joining | 0 | 15,262 | — | 54.4% |
Year-by-year record
The yearly average that drives every verdict
| Year | Avg skill | Skill Δ | Salary | Salary Δ | Gap | Verdict |
|---|---|---|---|---|---|---|
| 2026 | 53.8 | +2.2% | 16,712 | +7.1% | +1335 | Partial |
| 2025 | 52.6 | — | 15,262 | — | +175 | New |
Training record
Measured effect of each intervention
| Programme | Date | Hours | Before | After | Gain |
|---|---|---|---|---|---|
| Basic Machine Handling | 19 May 2026 | 39 | 50.5 | 54.2 | +3.7 |
| Overlock Efficiency Improvement | 16 Aug 2025 | 31 | 48.0 | 51.7 | +3.7 |
Personal file
From the IE assessment sheet and Jibika master