Shahnaz Akter
501234 · Operator · Sewing Line-C08 · joined 14 Dec 2024
Pay justification
Primary plus one secondary skill. A single cross-training completes the 1 + 2 standard — the cheapest capability gain available on this worker.
Skill and salary since joining — both indexed to 100
If the orange line falls below the blue one, pay has grown faster than measured capability.
Operation profile
Best recorded efficiency per operation
At least three assessed operations are needed to draw the profile.
Skill inventory
Every operation this worker has been tested on — the basis for line allocation
| Operation | Category | M/C | Best eff. | Grade | Tests | Last |
|---|---|---|---|---|---|---|
| Back Pocket Attach With Reinforce | Critical | SNLS | 90.4 | A+ | 7 | 14 Jun 2026 |
| Front Part Panel Top Stitch | Semi-critical | 2NCS | 73.8 | B+ | 4 | 14 Jun 2026 |
Latest assessment — 14 Jun 2026
Assessment #7 · periodic · assessor Kamrul Hasan (IE)
| Operation | Category | M/C | Target /hr | Cycle times (sec) | Avg cycle | Achieved /hr | Efficiency | Grade | ||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Back Pocket Attach With Reinforce | Critical | SNLS | 75 | 55.8 | 52.8 | 55.2 | 54.6 | 55.0 | 54.68 | 66 | 87.8% | A+ |
| Front Part Panel Top Stitch | Semi-critical | 2NCS | 150 | 34.7 | 35.9 | 34.0 | 35.1 | 35.4 | 35.03 | 103 | 68.5% | B- |
Target /hr = 60 ÷ SMV. Achieved /hr = 3600 ÷ average cycle time. Efficiency = achieved ÷ target. Identical to the IE department's stop-watch method.
Assessment history
Complete audit trail
| # | Date | Type | Skill | Grade | Ops | Entitled |
|---|---|---|---|---|---|---|
| 7 | 14 Jun 2026 | periodic | 79.2 | B+ | 2 | 19,149 |
| 6 | 14 Mar 2026 | periodic | 79.9 | B+ | 2 | 19,045 |
| 5 | 14 Dec 2025 | periodic | 79.2 | B+ | 2 | 18,908 |
| 4 | 14 Sept 2025 | periodic | 73.8 | B+ | 2 | 18,662 |
| 3 | 14 Jun 2025 | periodic | 83.5 | A | 1 | 18,770 |
| 2 | 14 Mar 2025 | periodic | 82.2 | A | 1 | 18,619 |
| 1 | 14 Dec 2024 | joining | 81.3 | A | 1 | 18,479 |
Salary history
Every revision, with the skill level at the time
| Effective | Reason | From | To | Increase | Skill then |
|---|---|---|---|---|---|
| 14 Dec 2025 | annual increment | 17,168 | 18,713 | +9.0% | 79.2% |
| 14 Dec 2024 | joining | 0 | 17,168 | — | 81.3% |
Year-by-year record
The yearly average that drives every verdict
| Year | Avg skill | Skill Δ | Salary | Salary Δ | Gap | Verdict |
|---|---|---|---|---|---|---|
| 2026 | 79.5 | -0.7% | 18,713 | +8.2% | -516 | Partial |
| 2025 | 80.0 | -1.6% | 18,713 | +0.8% | -195 | Not justified |
| 2024 | 81.3 | — | 17,168 | — | -1311 | New |
Training record
Measured effect of each intervention
No training recorded for this worker.
Personal file
From the IE assessment sheet and Jibika master