Parvin Aktar
500270 · Operator · Sewing Line-B04 · joined 17 Apr 2025
Pay justification
Only 55% on Flap Join with 1/16"–1/4" Top Stitch — below the 70% qualifying line. Either put a trainer on it or move the worker to a process that suits them.
Skill and salary since joining — both indexed to 100
If the orange line falls below the blue one, pay has grown faster than measured capability.
Operation profile
Best recorded efficiency per operation
At least three assessed operations are needed to draw the profile.
Skill inventory
Every operation this worker has been tested on — the basis for line allocation
| Operation | Category | M/C | Best eff. | Grade | Tests | Last |
|---|---|---|---|---|---|---|
| Top st. at waist | Semi-critical | MNCS | 63.9 | B- | 3 | 17 Jul 2026 |
| Flap Join with 1/16"–1/4" Top Stitch | Semi-critical | SNLS / 2NCS | 55.1 | C | 6 | 17 Jul 2026 |
Latest assessment — 17 Jul 2026
Assessment #6 · post training · assessor Md. Rafiqul Islam (IE)
| Operation | Category | M/C | Target /hr | Cycle times (sec) | Avg cycle | Achieved /hr | Efficiency | Grade | ||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Top st. at waist | Semi-critical | MNCS | 133 | 41.7 | 43.8 | 45.1 | 42.4 | 40.8 | 42.74 | 84 | 63.2% | B- |
| Flap Join with 1/16"–1/4" Top Stitch | Semi-critical | SNLS / 2NCS | 86 | 72.9 | 76.3 | 77.4 | 81.2 | 74.8 | 76.53 | 47 | 54.9% | C |
Target /hr = 60 ÷ SMV. Achieved /hr = 3600 ÷ average cycle time. Efficiency = achieved ÷ target. Identical to the IE department's stop-watch method.
Assessment history
Complete audit trail
| # | Date | Type | Skill | Grade | Ops | Entitled |
|---|---|---|---|---|---|---|
| 6 | 17 Jul 2026 | post training | 59.0 | C | 2 | 15,346 |
| 5 | 17 Apr 2026 | periodic | 56.7 | C | 2 | 15,188 |
| 4 | 17 Jan 2026 | periodic | 59.4 | C | 2 | 15,135 |
| 3 | 17 Oct 2025 | post training | 55.1 | C | 1 | 14,937 |
| 2 | 17 Jul 2025 | periodic | 50.6 | C | 1 | 14,826 |
| 1 | 17 Apr 2025 | joining | 52.1 | C | 1 | 14,718 |
Salary history
Every revision, with the skill level at the time
| Effective | Reason | From | To | Increase | Skill then |
|---|---|---|---|---|---|
| 17 Apr 2026 | annual increment | 14,274 | 15,559 | +9.0% | 56.7% |
| 17 Apr 2025 | joining | 0 | 14,274 | — | 52.1% |
Year-by-year record
The yearly average that drives every verdict
| Year | Avg skill | Skill Δ | Salary | Salary Δ | Gap | Verdict |
|---|---|---|---|---|---|---|
| 2026 | 58.3 | +10.8% | 15,559 | +5.6% | +176 | Earned |
| 2025 | 52.6 | — | 14,274 | — | -736 | New |
Training record
Measured effect of each intervention
| Programme | Date | Hours | Before | After | Gain |
|---|---|---|---|---|---|
| Overlock Efficiency Improvement | 06 Jun 2026 | 11 | 44.8 | 59.0 | +14.2 |
| New Style Changeover Drill | 18 Sept 2025 | 9 | 49.4 | 55.1 | +5.7 |
Personal file
From the IE assessment sheet and Jibika master